Maximum likelihood and Bayes estimates based on scheme 2, m = 4, <i>p</i><sub>(2)</sub> = (0, 0.2, 0.50, 0.75, 1), <i>θ</i> = 3.2, <i>β</i> = 5.9, λ = 1.75 using real data.
收藏NIAID Data Ecosystem2026-03-12 收录
数据链接:
官方服务:
资源简介:
Maximum likelihood and Bayes estimates based on scheme 2, m = 4, p(2) = (0, 0.2, 0.50, 0.75, 1), θ = 3.2, β = 5.9, λ = 1.75 using real data.
创建时间:
2021-06-02




