five

Test instances for the job shop scheduling problem with flexible maintenance planning and double due dates

收藏
DataCite Commons2025-09-23 更新2025-04-17 收录
下载链接:
https://research.lancaster-university.uk/en/datasets/73ed33da-04c2-42e7-ab81-ae5ae7ed5ca5
下载链接
链接失效反馈
官方服务:
资源简介:
These test instances were created to test the algorithms presented in Ivar Struijker Boudier's PhD thesis, titled "Job Shop Scheduling with Flexible Maintenance Planning" (2017). A full description of the test instances can be found in the thesis. The algorithms in the thesis solve the job shop scheduling problem with flexible maintenance activities and double due dates. The test problems are suitable for both the blocking and the non-blocking variants of this problem.
提供机构:
Lancaster University
创建时间:
2017-07-13
二维码
社区交流群
二维码
科研交流群
商业服务