five

Construction duration predictive model based on factorial analysis and fuzzy logic

收藏
DataCite Commons2020-08-26 更新2024-07-27 收录
下载链接:
https://scielo.figshare.com/articles/Construction_duration_predictive_model_based_on_factorial_analysis_and_fuzzy_logic/9956945/1
下载链接
链接失效反馈
官方服务:
资源简介:
Abstract Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computational intelligence tools that can contribute to reduce the degree of uncertainty. This study aimed to investigate the use of a hybrid system to estimate the deadline for vertical residential building works from design and production characteristics using factorial analysis and Fuzzy Systems. To this end, we used information of a database from the SEURB and in some buildings construction companies in Belém, a city located in the State of Pará, northern of Brazil. For the training and construction of the Fuzzy Forecast Model, data from 71 projects were used and 16 others residential buildings were used for its validation. The results showed a significant level of assertiveness, with 75% accuracy considering a range, whose upper and lower limits were calculated from MAPE and MASE. The model presented a prediction performance superior to other models already consecrated in the literature.
提供机构:
SciELO journals
创建时间:
2019-10-09
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作