Table- 8.2. Institutional roles and responsibilities in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
收藏资源简介:
Table-8.2. Institutional roles and responsibilities Project stageResponsible organizationResponsibilitiesPre-constructionEGCB Ltd. (with the assistance from project consultant)i. Prepare EIA consistent with GOB and WB requirements ii. Conduct public consultation during EIA iii. Fulfill GOB requirements iv. Make EIA reports available to the web sitev. Incorporate mitigation measures into engineering design and technical specificationvi. Incorporate environmental mitigation and monitoring measures into contract documentvii. Update the EMP (mitigation measures, monitoring program, institutional responsibilities, costs, etc.) during the detailed design stage.ConstructionEGCB Ltd.,i. With the assistance of project consultants, ensure implementation of environmental management measures at each stage of the construction and update the EMP as necessary.ii. Complain Redresser Committee will attend any kind of environmental and social complain arising from the residents and workers during construction and operation phases of the proposed project.Project consultanti. Review the construction site management plan to be prepared by the contractor.ii. Provide support to EGCB in conducting routine monitoring of implementation of mitigation