Reasons for cost overrun in construction projects worldwide 2008
收藏www.statista.com2025-01-21 收录
下载链接:
https://www.statista.com/statistics/526875/reasons-for-cost-overruns-in-construction-projects/
下载链接
链接失效反馈官方服务:
资源简介:
This statistic shows the most common reasons for cost overrun in construction projects around the world as of 2008. Data is based on a survey among leaders in the construction industry. 60 percent of respondents referenced material price escalation as a reason for cost overruns in a project making it the most commonly cited reason.
本统计数据显示,截至2008年,全球建筑项目中成本超支的最常见原因。数据来源于对建筑行业领导者的调查。60%的受访者将材料价格上升作为项目成本超支的原因,使其成为最常被提及的原因。
提供机构:
Statista


