ASTER L1B Registered Radiance at the Sensor V003
收藏Global Change Master Directory (GCMD)2026-01-16 更新2026-04-25 收录
下载链接:
https://cmr.earthdata.nasa.gov/search/concepts/C3553655804-LPCLOUD.html
下载链接
链接失效反馈官方服务:
资源简介:
The AST_L1B Version 3 data product was decommissioned on December 15, 2025. Users are encouraged to use the [AST_LB1 Version 4 of this product](https://doi.org/10.5067/ASTER/AST_L1B.004)
The Terra Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Level 1B (AST_L1B) Registered Radiance at the Sensor data product is radiometrically calibrated and geometrically co-registered. Application of intra-telescope and inter-telescope registration corrections for all bands are relative to the reference band for each telescope: Visible and Near Infrared (VNIR) Band 2, Shortwave Infrared (SWIR) Band 6, and Thermal Infrared (TIR) Band 11. The AST_L1B product has a spatial resolution of 15 meters (m) for the VNIR bands, 30 m for the SWIR bands, and 90 m for the TIR bands.
The ASTER L1B Registered Radiance at the Sensor data product is only available through [NASA's Earthdata Search](https://search.earthdata.nasa.gov/search?q=C190733714-LPDAAC_ECS). The ASTER Order Instructions provide step-by-step directions for ordering this product.
Known Issues
* TIR bands: Acquisitions for TIR bands ended on January 16, 2026, at 05:10:45 UTC, when the ASTER TIR instrument was permanently turned off due to power limitations on the Terra spacecraft. More information is available in this [NASA Science News Brief](https://science.nasa.gov/blogs/science-news/2026/02/12/terra-adjusts-instrument-operations-to-extend-mission-life/).
* Data acquisition gaps: On November 28, 2024, one of Terra's power-transmitting shunt units failed. As a result, there was insufficient power to maintain functionality of the ASTER instrument. ASTER resumed acquisitions for the VNIR bands on January 18, 2025, and for the TIR bands on April 15, 2025. Users should note the data gap in ASTER acquisitions from November 28, 2024, through January 16, 2025, for VNIR observations, and a gap from November 28, 2024, through April 15, 2025, for TIR acquisitions.
* SWIR bands: ASTER SWIR detectors are no longer functioning as of January 12, 2009, due to anomalously high SWIR detector temperatures.
* SWIR anomaly: Users are advised that ASTER SWIR data acquired from April 2008 to January 11, 2009, exhibit anomalous saturation of values and anomalous striping. This effect is also present for some prior acquisition periods. Please refer to the [ASTER SWIR User Advisory](https://lpdaac.usgs.gov/documents/1661/ASTER_SWIR_User_Advisory_Jan_12_2009.pdf) for more details.
Processing Improvements/Changes
* Starting June 23, 2021, radiometric calibration coefficient Version 5 (RCC V5) will be applied to newly observed ASTER data and archived ASTER data products. Details regarding RCC V5 are described in the following journal article.
* Tsuchida, S., Yamamoto, H., Kouyama, T., Obata, K., Sakuma, F., Tachikawa, T., Kamei, A., Arai, K., Czapla-Myers, J.S., Biggar, S.F., and Thome, K.J., 2020, Radiometric Degradation Curves for the ASTER VNIR Processing Using Vicarious and Lunar Calibrations: Remote Sensing, v. 12, no. 3, at https://doi.org/10.3390/rs12030427.
提供机构:
LPCLOUD
创建时间:
2026-01-16



