Utah FORGE: Video of Utah FORGE Drilling Planning for Production Well 16B(78)-32
收藏OpenEI2026-03-14 收录
下载链接:
https://data.openei.org/submissions/7574
下载链接
链接失效反馈官方服务:
资源简介:
This is a YouTube video containing the specifics of well planning for Utah FORGE 16B(78)-32. This well will be drilled as a doublet approximately 300 feet parallel to and above 16A(78)-32 and will be drilled between approximately April 15th and July 17th 2023.



