TIME OPTIMIZATION IN PRODUCTION LINE USING LEAN TOOL
收藏NIAID Data Ecosystem2026-05-02 收录
官方服务:
资源简介:
This case study objective is to reduce changeover minutes in electrical accessories production line using SMED technique- A lean tool. SMED denotes principles, methodologies employed to minimize equipment setup durations. SMED aims to achieve setup times of under ten minutes, specifically a single-digit number of minutes. More internal setup and changeover time. Impacted stake holders in the organization due to the above challenges are Production, Logistics, Finance and Supply chain sectors.
创建时间:
2025-05-07



