Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times

收藏
DataCite Commons2025-04-01 更新2024-08-18 收录
下载链接:
https://tandf.figshare.com/articles/dataset/Constraint_programming_approach_for_multi-resource-constrained_unrelated_parallel_machine_scheduling_problem_with_sequence-dependent_setup_times/14047052/1
下载链接
链接失效反馈
官方服务:
资源简介:
This paper studies the multi-resource-constrained unrelated parallel machine scheduling problem under various operational constraints with the objective of minimising maximum completion time among the scheduled jobs. Sequence-dependent setup times, precedence relations, machine eligibility restrictions and release dates are incorporated into the problem as operational constraints to reflect real-world manufacturing environments. The considered problem is in NP-hard class of problems, which cannot be solved in deterministic polynomial time. Our aim in this study is to develop an exact solution approach based on constraint programming (CP), which shows good performance in solving scheduling problems. In this regard, we propose a CP model and enrich this model by adding lower bound restrictions and redundant constraints. Moreover, to achieve a reduction in computation time, we propose two branching strategies for the proposed CP model. The performance of the CP model is tested using randomly generated and benchmark instances from the literature. The computational results indicate that the proposed CP model outperforms the best solutions with an average gap of 15.52%.
提供机构:
Taylor & Francis
创建时间:
2021-02-17
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作