five

Bi-objective optimization for last-train coordination planning with dwell time adjustment strategy

收藏
NIAID Data Ecosystem2026-03-11 收录
下载链接:
http://datadryad.org/dataset/doi%253A10.5061%252Fdryad.dv41ns1v2
下载链接
链接失效反馈
官方服务:
资源简介:
In the design of last-train coordination plan, adjusting (extending/reducing) dwell time can balance economic and service goals for operation company and late-night passengers, especially when transfer-passenger flow is uncertain. For this purpose, we first develop a bi-objective scenario-based stochastic programming model for last-train coordination planning problem combined with the dwell time adjustment strategy. Then, we develop a two-phase approach, wherein the first phase we adopt the varepsilon-constraint method to reformulate the original model to a modified single-objective one. This is followed by the second phase using the branch-and-bound algorithm implemented by the CPLEX solver to obtain Pareto-optimal solutions (frontier). Finally, we demonstrate the advantage of the proposed model through comparison with the corresponding model without dwell time strategy and the max-min robust model over a randomly generated small-scale network. Moreover, we also illustrate the application of the proposed model by a real-world case study on the large-scale Beijing subway network.
创建时间:
2020-02-07
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作