Louisville Metro KY - Jefferson County Demolitions, Demolished from FY2003 to FY2020
收藏LOJIC Open Data Portal2026-03-21 收录
下载链接:
https://data.lojic.org/maps/9f2650a8b127424d99c2f5e76528a0d0
下载链接
链接失效反馈官方服务:
资源简介:
<span style='color:rgb(77, 77, 77); font-family:Lato; font-size:16px;'>Develop Louisville Focuses on the full range of land development activities, including planning and design, vacant property initiatives, advanced planning, housing & community development programs, permits and licensing, land acquisition, public art and clean and green sustainable development partnerships.</span><div><font color='#4d4d4d' face='Lato'><span style='font-size:16px;'><br /></span></font></div><div><font color='#4d4d4d' face='Lato'><span style='font-size:16px;'>Data Dictionary:</span></font></div><div><ol><li><span style='background-color:rgb(255, 255, 255);'>Street# – Street number of property address</span></li><li><span style='background-color:rgb(255, 255, 255);'>Dir – Cardinal direction of propery address (N, S, E, W)</span></li><li><span style='background-color:rgb(255, 255, 255);'>Street – Name of street</span></li><li><span style='background-color:rgb(255, 255, 255);'>Type – Type of street (St, Rd, Dr, Ave, Blvd, etc)</span></li><li><span style='background-color:rgb(255, 255, 255);'>Post Dir – Suffix of property address (Half, Rear)</span></li><li><span style='background-color:rgb(255, 255, 255);'>Loc – Structure that was demolished at the address (Entire structure, garage, outbuilding, etc)</span></li><li><span style='background-color:rgb(255, 255, 255);'>Zip – Zip code</span></li><li><span style='background-color:rgb(255, 255, 255);'>Council – Council District in which the property is located</span></li><li><span style='background-color:rgb(255, 255, 255);'>Neighborhood – Neighborhood in which the property is located</span></li><li><span style='background-color:rgb(255, 255, 255);'>Referred – Date the property was referred for demolition by the Code Enforcement Officer or Building Inspector</span></li><li><span style='background-color:rgb(255, 255, 255);'>Down & Clear – Date the site passed the final wrecking inspection. The final wrecking inspection verifies the structure was demolished, all debris was removed from the site, and the lot was properly graded then seeded and strawed.</span></li><li><span style='background-color:rgb(255, 255, 255);'>Status Definitions:<br />a) Appeal – The property owner has appealed the demolition order.<br />b) Awarded – The demolition contract has been awarded to the demolition contractor. Structures are awarded in batches (up to 10 structures at a time). Structure should be down & clear within 90 days of the contract being awarded.<br />c) BPAT – The property is being reviewed by the Blighted Property Action Team.<br />d) D&C – Down & Clear, the structure has been demolished and the site has passed the final wrecking inspection.<br />e) In Process – The demolition has been approved and preparations for demolition are being made. Prior to demolition, all structures are tested for asbestos, any asbestos found is abated, and the exterior of the structure is treated for lead-based paint.</span></li></ol><div><font color='#000080' face='Lato'><span style='font-size:16px;'>Contact:</span></font></div><div><a href='mailto:VAP@louisvilleky.gov' style='box-sizing:border-box; font-family:Lato; font-size:16px;' rel='nofollow ugc'><font color='#000080' style='background-color:rgb(255, 255, 255);'>VAP@louisvilleky.gov</font></a><font color='#4d4d4d' face='Lato'><span style='font-size:16px;'><br /></span></font></div><div><span style='color:rgb(77, 77, 77); font-family:Lato; font-size:16px;'><br /></span></div></div>



