前滩21-03项目监测月报(地铁变形、病害数据)
收藏资源简介:
面向前滩21-03项目施工,对邻近的上海轨道交通6号线、8号线、11号线的沉降、收敛等变形情况开展监测,通过人工全站仪测量、静力水准自动化测量、激光测距仪自动化测量等,及时掌握地铁变形情况,并将数据传输至课题的地下基础设施智慧集成平台,为平台提供基础数据支撑,通过平台集成的相关智能诊断模块,融合平台打通壁垒接入的基坑自身变形数据,对隧道的结构安全做出判断,从而保障地铁运营和市民乘客安全。
Targeting the construction of the Qiantan 21-03 Project, monitoring is conducted on deformation conditions including settlement and convergence of the adjacent Shanghai Rail Transit Lines 6, 8 and 11. Via manual total station measurement, automated static leveling measurement, automated laser rangefinder measurement and other methods, the deformation status of the metro lines is grasped in a timely manner, and the collected data is transmitted to the intelligent integration platform for underground infrastructure of this research project, providing basic data support for the platform. By leveraging the relevant intelligent diagnosis modules integrated on the platform and integrating the self-deformation data of the foundation pit that the platform has accessed by breaking down data silos, judgments are made on the structural safety of the metro tunnels, thereby ensuring the safe operation of the metro and the safety of the general public and passengers.




