Guidelines for defining assembly batches of engineer-to-order concrete prefabricated systems

收藏
DataCite Commons2020-08-26 更新2024-07-27 收录
下载链接:
https://scielo.figshare.com/articles/Guidelines_for_defining_assembly_batches_of_engineer-to-order_concrete_prefabricated_systems/11350865
下载链接
链接失效反馈
官方服务:
资源简介:
Abstract The potential benefits of engineer-to-order (ETO) prefabricated building systems include reductions in project cost and duration, and improvements in product quality. However, the scope of production planning and control systems in that context must be different from traditional projects, since it is necessary to coordinate different types of flows (design, manufacturing, logistics operations and site assembly). In this context, it is necessary to stabilise those flows and consequently reduce work in progress, which is strongly related to the effort of reducing production batch size. The aim of this research work is to propose a set of guidelines for the definition of assembly batches for ETO prefabricated concrete system, with the support of 4D BIM, based on concepts and principles of the lean production philosophy. Design Science Research was the methodological approach adopted in this investigation, which was based on an empirical study carried out in an airport expansion project. The main contributions of this study are a set of decision categories for the definition of assembly batches, and the development of tools for supporting decision-making in this context.
提供机构:
SciELO journals
创建时间:
2019-12-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作