Lattice24 Big J add-ons and tests (1 November 2026)
收藏资源简介:
Lattice24 Big J: add-ons and tests, 1 November 2026. Every plan locked before any graded number; first-lock failures kept; a second lock is a re-test, not a replication. Follows restricted record 10.5281/zenodo.23698068. 1. Lean-172 council add-ons as tools: circuit-meaning check, thermal-noise check, plant-call meters and key labels, first built against third-party Lean files and then rebuilt with no outside answer key (textbook mathematics in our own code): conform v2 PASS (lock 1 FAIL kept), thermal v2 PASS, plantmeter v2 PASS; the first versions are kept as record (conform lock 1 FAIL then PASS, thermal PASS, plantmeter lock 1 FAIL then PASS, scope labels FAIL on both locks). 2. Provision 3: the next five of Big J's own ranked picks, every key our own computation: two-particle scattering for stable radial forces, FK planar maps at q = 4, unitary rational chiral CFT data with the critical Ising ring, FK planar maps above four, planar Schrodinger evolution by a 20-qubit QFT circuit; all five PASS first lock with every planted mistake caught. 3. A test of Big J's own math choosing his tools: FAIL on both locks, not live. Big J engine source, gate parameters and keys are not included. Classical simulator; no claim of quantum advantage. Patent pending: US provisional application 64/179,295, filed 19 October 2026. Further rights reserved.



