Long Term Development Statement (LTDS) Table 5 Generation
收藏opendatasoft2025-11-28 更新2024-05-31 收录
下载链接:
https://data.opendatasoft.com/explore/dataset/ltds-table-5-generation@ukpowernetworks/table/
下载链接
链接失效反馈官方服务:
资源简介:
Introduction
The Long Term Development Statements (LTDS) report on a 0-5 year period, describing a forecast of load on the network and envisioned network developments. The LTDS is published at the end of May and November each year.
Long Term Development Statement Table 5 shows the capacity of existing distributed generation connected at each Primary substation. It also includes a snapshot of accepted connections at the time. Published 28 November 2025.
More information and full reports are available from the landing page below:
Long Term Development Statement and Network Development Plan Landing Page
Methodological Approach
Site Functional Locations (FLOCs) are used to associate the Substation to Key characteristics of active Grid and Primary sites — UK Power Networks
ID field added to identify row number for reference purposes
Quality Control Statement
Quality Control Measures include:
Verification steps to match features only with confirmed functional locations.
Manual review and correction of data inconsistencies.
Use of additional verification steps to ensure accuracy in the methodology.
Assurance Statement
The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency.
Other
Download dataset information: Metadata (JSON)
Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Open Data Portal GlossaryTo view this data please register and login.