five

City Senior Center Interval Energy Data

收藏
City of Cambridge, MA Open Data Portal2023-11-03 更新2026-03-28 收录
下载链接:
https://data.cambridgema.gov/d/uuej-6t9x
下载链接
链接失效反馈
官方服务:
资源简介:
5-minute interval electric data for the Cambridge Senior center located at 806 Massachusetts Avenue from April 2013 through July 2018. The dataset enables analysis of electricity usage patterns over a series of days, weeks, months and years; this can help identify opportunities to reduce energy use and demand and can be used as a starting point to correlate energy consumption changes with conservation measures. Electricity use is the amount of electricity that has been consumed over a certain period of time. Electricity demand is the maximum amount of electrical energy that is being consumed at a given time. Electricity use is measured in kilowatt hours (kWh). Electricity demand is measured in kilowatts (kW). Additionally, this dataset contains measurements for Power Factor and Reactive Power. Power Factor is the ratio of the real power that is flowing to the load and the apparent power that is supplied to the circuit. Reactive Power occurs in alternating current circuits when there is a phase difference between voltage and current. It is measured in kVAR for demand and kVARh for use.
提供机构:
data.cambridgema.gov
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作