WMS XPlanung BPL “Cross field — 1st change”
收藏官方服务:
资源简介:
WMS service of the development plan “Kreuzfeld — 1st change” of the municipality of Malterdingen from XPlanung 5.0. Description: The reason for the change of development plan is the expansion intention of the west-neighboring farm to Flst. No. 6664/2. The extension is to take place in the east, within the scope of the development plan “Kreuzfeld”. This should also include the planned.
源自XPlanung 5.0的马尔特丁根(Malterdingen)市镇「克罗伊茨费尔德(Kreuzfeld)——第一修订版」开发计划的WMS服务。说明:本次开发计划修订的原因在于西侧相邻农场拟向Flst.编号6664/2地块实施扩张。该扩张活动将在东侧的「克罗伊茨费尔德」开发计划范围内开展,且相关内容亦应纳入本次规划范畴。
创建时间:
2021-10-18



