遇见数据集

Table 6 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ

收藏
Zenodo2026-02-11 更新2026-05-26 收录
官方服务:

资源简介:

Table 6 (A) - Emissions Guidelines (in mgłNm 3 or as indicated) for Reciprocating Engine Note: - Guidelines are applicable for new facilities. - EA may justify more stringent or less stringent limits due to ambient environment, technical and economic considerations provided there is compliance with applicable ambient air quality standards and incremental impacts are minimized. - For projects to rehabilitate existing facilities, case-by-case emission requirements should be established by the EA considering (i) the existing emission levels and impacts on the environment and community health, and (ii) cost and technical feasibility of bringing the existing emission levels to meet these new facilities limits. - EA should demonstrate that emissions do not contribute a significant portion to the attainment of relevant ambient air quality guidelines or standards, and more stringent limits may be required. Combustion Technology ł Fuel Reciprocating EngineParticulate Matter (PM) NDA DASulfur Dioxide (SO 2) NDA DANitrogen Oxides (NOx) NDADADry Gas, Excess O 2 Content (%)Natural GasN/AN/AN/AN/A200 (Spark Ignition) 400 (Dual Fuel) (a)200(SI) 400 (Dual Fuel / CI)15%Liquid Fuels (Plant>50 MWth to <300 MWth)50301,170 or use of 2% or less S fuel0.5% S1,460 (Compression Ignition, bore size diameter [mm] <400) 1,850 (Compression Ignition, bore size diameter [mm] ≥ 400) 2,000 (Dual Fuel)40015%Liquid Fuels (Plant>ł=300 MWth)5030585 or use of 1% or less S fuel0.2% S740 (contingent upon water availability for injection)40015%Biofuels ł Gaseous Fuels other than Natural Gas5030N/AN/A30% higher limits than those provided above for Natural Gas and Liquid Fuels.200 (SI, Natural Gas), 400 (other)15%

提供机构:
World Bank (WB)
创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务