遇见数据集

Summary of flooding, time since dam filling, distance from river and coordinates of the 66 plots sampled around the Santo Antônio hydroelectric dam, Western Amazonia, Brazil.

收藏
Figshare2021-06-17 更新2026-04-28 收录
官方服务:

资源简介:

Pre-stage flooded = plots that were sampled pre-filling that were flooded; pre-stage unflooded = plots that were sample pre-filling that were not flooded; post1-stage = plots sampled 1 year after reservoir filling; post2-stage = plots sampled 4 years after reservoir filling. (XLSX)

创建时间:
2021-06-17
二维码
社区交流群
二维码
科研交流群
商业服务