RMS deviation of experimental mean velocity profile from volume-adjusted theoretical solution, normalized by volume-adjusted theoretical maximum displacement.
收藏NIAID Data Ecosystem2026-03-08 收录
数据链接:
官方服务:
资源简介:
*These values are within the uncertainty of the theoretical solution. The RMS uncertainty of the theoretical Poiseuille solution was computed by propagation of error obtained from manufacturer-provided uncertainties of the pump flow rate and tubing diameter and was determined to be 0.1461 (normalized by the volume-adjusted theoretical maximum displacement).
创建时间:
2013-11-18



