five

Excavation of Sidewalk at Tombstone Courthouse

收藏
DataONE2016-03-01 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV8N018C2_meta$v=1456790823863
下载链接
链接失效反馈
官方服务:
资源简介:
As part of an ongoing effort to bury the utility lines at Tombstone Courthouse State Park, helping to recreate the 1800's aesthetics, in April of 1988 a trench for a telephone line conduit was dug (east to west) in the northeast yard at the Courthouse. Located four feet N.E. of the corner of the east wing, the trench encountered what appeared to be possible (although rather small) flagstone pavers. The stones were not broken by the construction and were placed in position to await further investigation. The trench outlined above, in conjunction with a couple of small stones exposed near the tree trunk, at the N.E. corner of the north wing, and near the metal gate into the southeast yard led us to believe that the area merited investigation. Prior to the telephone trench the exposed pavers had been thought to be all that was left of a previous flagstone sidewalk until the trenching tipped the individuals creating the telephone trench to the fact that there were stones below grade.
创建时间:
2016-03-01
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作