遇见数据集

TRINITY DC 02.04.01 New RES plant investment analysis

收藏
Zenodo2023-05-19 更新2026-05-26 收录
数据链接:
官方服务:

资源简介:

This demo aims at testing the capacity of the Dynamic Map cluster of modules of the T-RES CONTROL CENTRE to speed-up and optimize the decision making process for selecting the optimal characteristics for a new RES installation in a given pre-defined location. This dataset contains replicable cases for the use of the product created in TRINITY, Dynamic Map. The inputs used are the following: Active power Reactive power Technology case Asset model Location Substation Forecast spot prices

提供机构:
Zenodo
创建时间:
2023-05-19
二维码
社区交流群
二维码
科研交流群
商业服务