This experiment was established on top of subplots 24, 25 and 26 of E055 (1.2m X 1.2m plots). Sheet metal was installed to divide the subplots into 4 equal parts (subplots are 1.2m x 1.2m, sub-subplot
Soil samples were obtained from the prepared test field by manual sampling with a metal tube. Samples were taken inside and outside several footprints, indicated by differing sampling depths, i.e., di