five

Channel Tunnel Rail Link Section 1

收藏
DataCite Commons2020-10-10 更新2024-08-27 收录
下载链接:
http://archaeologydataservice.ac.uk/archives/view/ctrl/
下载链接
链接失效反馈
官方服务:
资源简介:
The Phase 1 archive of the Channel Tunnel Rail Link (CTRL), representing the route of the link from Fawkham Junction (Gravesham) to Folkestone, is a major new research archive for the archaeology of Kent. The construction of the Channel Tunnel Rail Link has provided a unique opportunity to investigate thousands of years of change and development across the landscape and the archaeological programme of works associated with CTRL is probably the largest ever undertaken in the UK. The Link is the first new railway to be built in Britain for over a century and runs for 109km (68 miles) between St Pancras station in London and the Channel Tunnel. The Phase 1 archive represents the first 74 km of this route and was finished in September 2003. The CTRL Phase 1 archive is organised at a site level allowing access to data from 122 interventions and is accompanied by extensive introductory text both at an overall project level as well as the individual site level. The archive itself contains site reports, site datasets and images for 122 excavations, evaluations and geophysical and standing building surveys provided in a number of file formats (RTF, PDF, CSV and SVG). The data can be accessed through any of three search interfaces (a spatial map search, a period search or an advanced search) or alternatively via a full site list. The CTRL archive is also fully integrated into the ADS's ArchSearch catalogue allowing spatial searches to retrieve CTRL site level data alongside archaeological data from a number of other sources such as the National Trust SMR and the National Monuments Record.
提供机构:
Archaeology Data Service
创建时间:
2011-09-23
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作