As part of the Long Term Ecological Research (LTER) project in the McMurdo Dry Valleys of Antarctica, a systematic sampling program has been undertaken to monitor the glacial meltwater streams in that
Observation wells were installed for the purpose of continuously monitoring the water table level during the 2012 and 2013 growing seasons at the Wibu field site. These data were then used to study th
Streambed instruments that measure electrical resistivity were constructed and installed along the main channel in San Antonio Creek and along tributary streambeds in...
Year 2004 continuous measurements, every 15 minutes, were made of stage, water temperature, conductivity, and dissolved oxygen in a small headwater stream, Saw Mill Brook, Burlington, MA, draining a h