Measured relaxation times for white matter, gray matter and CSF mimics at 64 mT, 21.5 °C +/- 0.5 °C at construction and again at 10, 22, and 31 weeks after construction.
收藏NIAID Data Ecosystem2026-05-01 收录
数据链接:
官方服务:
资源简介:
The experimental measurements are reported as the mean value over six image slices with the standard deviation in parentheses.
创建时间:
2023-07-12




