Flowshop scheduling problems with release and delivery dates
收藏Mendeley Data2017-11-21 更新2026-04-09 收录
下载链接:
https://data.mendeley.com/datasets/m2wcd42pvy/1
下载链接
链接失效反馈官方服务:
资源简介:
We randomly generated two groups of 150 test instances for the problem addressed in this work. The first group contains instances with 100 jobs which must be processed on 2 machines. In the second group, the instances have 200 jobs with the same conditions as before. The instance naming follows the pattern knar. For example, instance k2n100a0.1r0.7 has N = 100 jobs; K = 2 delivery dates; parameter alpha, used to give the first delivery date, is alpha = 0,1; and R = 0,7 is the same parameter R used to define the release date of each job.