five

First to signal criterion for comparing control chart performance

收藏
Taylor & Francis Group2023-08-14 更新2026-04-16 收录
下载链接:
https://tandf.figshare.com/articles/dataset/First_to_signal_criterion_for_comparing_control_chart_performance/23948772/1
下载链接
链接失效反馈
官方服务:
资源简介:
Control chart performance is often measured using average run length or median run length, which gives the expected or median number of samples to signal. It is often argued that on average, one chart will signal a process change quicker than another, and is therefore a better choice. Average and median run length do not, however, answer the question of which method will be more likely to signal first. We introduce the idea of “first to signal” and compare charts based on this criterion.
提供机构:
Wilson, James D.; Rigdon, Steven E.; Stevens, Nathaniel T.; Woodall, William H.
创建时间:
2023-08-14
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作