遇见数据集

First to signal criterion for comparing control chart performance

收藏
Taylor & Francis Group2023-08-14 更新2026-04-16 收录
官方服务:

资源简介:

Control chart performance is often measured using average run length or median run length, which gives the expected or median number of samples to signal. It is often argued that on average, one chart will signal a process change quicker than another, and is therefore a better choice. Average and median run length do not, however, answer the question of which method will be more likely to signal first. We introduce the idea of “first to signal” and compare charts based on this criterion.

创建时间:
2023-08-14
二维码
社区交流群
二维码
科研交流群
商业服务