five

Scheduling method for pairing night-shift and morning-shift duties on metro lines with complex structure

收藏
Figshare2022-12-20 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/Scheduling_method_for_pairing_night-shift_and_morning-shift_duties_on_metro_lines_with_complex_structure/21755893
下载链接
链接失效反馈
官方服务:
资源简介:
Scheduling the night-shift and morning-shift duties pairing plan (NMDPP) is a common process in Chinese metro crew management. Since metro crews work in a special working environment, sufficient rest is essential for them. NMDPP will affect the rest time of crews on metro lines with multiple depots and handover points. To improve the rest time of crews, this paper proposes a binary programming model to optimise the NMDPP. Moreover, a hybrid algorithm combining General Variable Neighbourhood Search (GVNS) with an Assignment Algorithm is designed to find high-quality solutions for this problem. Finally, computational experiments with both artificial data and real-life data are conducted. The results indicate that the GVNS can obtain high-quality solutions efficiently for various NMDPPs. Besides, the proposed method can effectively increase the rest time of crews compared to the practical method used in metro companies.
创建时间:
2022-12-20
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作