Table 6 - 1 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
收藏资源简介:
Table 6-1: Record of Field Reconnaissance DateDescription and purpose30 October 2018The first reconnaissance was undertaken on October 30th, 2018 by a team of three consultants, two consultants from Typsa and one consultant from the local E&S subcontractor.9-26 January 2019Ground investigations were carried out from January 9 to 26 by ELLIPS, and a geotechnical expert from TYPSA was on site supervising the ground investigations, including the procedures and the collection of samples. A chemical analysis of the water quality of adjacent drainage canals was performed.5-6 March 2019The other two trips were done on March 5th and 6th 2019 by one consultant from Typsa, one consultant from 5 Capitals and one consultant from the local E&S subcontractor. The information provided in the baseline section is based on satellite imagery, information provided by an Uzbekistani environmental consultancy, information captured during a site visit undertaken by the 5 Capitals’ team on the 5th and 6th of March 2019, and information provided by administrative, interest and affected based stakeholders during consultation meetings. The first official round of stakeholder engagement activities (from an E&S perspective) took place in Navoi (city) and in Uzumzor on the 5th and 6th of March 2019.3-6 March 2020Ecology, social, archaeological site surveys carried out by AECOM with one specialist from Green Business Innovation and an ecologist from Navoi. Social surveys took place at Uzumzor and stakeholder meetings were held in Navoi and Uzumzor.