Replication Package for "Beyond the Critical Path: A Structural-Corridor Framework for Multi-Layer Criticality in CPM Schedules"
收藏官方服务:
资源简介:
code/results for the Section 4.8 public-data replication (8 largest DSLIB v3.1 projects); confidential megaproject data not included.
提供机构:
Zenodo创建时间:
2026-07-15



