Table 2 - 3 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
收藏Zenodo2025-11-27 更新2026-05-26 收录
下载链接:
https://zenodo.org/doi/10.5281/zenodo.17729835
下载链接
链接失效反馈官方服务:
资源简介:
Table 2-3: Water Requirements during Construction
ItemNumberConcrete RequirementWater RequirementInverter bases (1.6 x 2.8 x65950m3300m30.5m)Substation and office building11,200m3240m3Allow 30% extra for--75m3waste/washdownGeneral construction water--2,985m3needsTotal Construction Water3,600m 3Water needs for workers3651-10,658m3Total Potable Water10,658m 3
提供机构:
World Bank (WB)
创建时间:
2025-11-27



