five

Table 4 - 4 in 21 - MSK-JOR-ENV - Preliminary Risks Assessment and ESIA for the Aqaba-Amman Water Desalination and Conveyance (AAWDC) Project (Jordan) - Renewable Energy Component

收藏
Zenodo2025-11-27 更新2026-05-26 收录
下载链接:
https://zenodo.org/doi/10.5281/zenodo.17730319
下载链接
链接失效反馈
官方服务:
资源简介:
Table 4-4: Step 3 - Assessing Duration and Extent CriterionDescriptorRating DefinitionDurationLong-termContinuous or regular (once per day) over Project life, with effects of long duration (> 10 years after construction).Medium-termEffect of medium duration (2 to 10 years after construction).Short-termEffect restricted to construction and/or up to 2 years after construction.RegionalFar-range impact; beyond a 5 km radius of Project site(s)ExtentLocalMedium-range impact within a 5 km radius of Project site(s)SiteOnsite specific impact within 100m radius from Project site(s)
提供机构:
European Investment Bank (EIB)
创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务