five

Bow Thruster Currents at Open Quay Constructions on Piles

收藏
DataCite Commons2021-10-31 更新2024-07-03 收录
下载链接:
https://data.4tu.nl/articles/_/12707462/1
下载链接
链接失效反馈
官方服务:
资源简介:
Research into hydraulic loads by a bow thruster. The hydraulic loads on the slope at an open quay construction on piles is investigated. The propeller (bow thruster) jet induces hydraulic loads on the bed, which could result in scour holes and damage to the quay construction. Performed scale model tests provide details about the hydraulic loads in this specific situation with an inclining slope and piles. Measurements are compared to the current engineering guidelines, to include in the design of open quay constructions on piles.
提供机构:
TU Delft, department hydraulic engineering
创建时间:
2013-06-03
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作