Reconnaissance Report on Recreational Potentialities of the Braziel Reservoir, North Platte River Basin (Off Stream), Soots Bluff County, Nebraska

收藏
DataONE2017-05-10 更新2024-06-26 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV8M047KN_meta$v=1494454505655
下载链接
链接失效反馈
官方服务:
资源简介:
This report is prepared at the request of Region 7 of the Bureau of Reclamation in accordance with their control schedule of August 1947, for the National Park Service, as amended by letter dated December 22, 1947. The Bureau of Reclamation district office at Casper, Wyoming, was visited on October 30, 1947, and current information on Braziel Reservoir site was secured from District Manager I. J. Matthews. A field study and investigation of the entire reservoir site were made on November 1, 1947, by Landscape Architect Raymond L. Freeman and Engineer Max E. Edgar. A general inspection of Goshen Hole Reservoir, Wyoming, was also made at the same time.