遇见数据集

Transport: Baseline: EV Charging Capacity Requirements Per Substation

收藏
Los Angeles Planning Department Data Hub2026-01-11 更新2026-04-25 收录
官方服务:

资源简介:

Author: Arup Creation date: 2025 Date of source data harvest: 2025 Temporal coverage: 2025 Spatial Resolution: Primary Substation Supply Area Geometry: Polygon Source data URL: Transport: Baseline: Vehicle Mileage Per Substation (Electric Vehicles) Transport: Baseline: EV Charger Demand Per Substation Transport: Baseline: EV Charger Demand Per Substation UK Power Networks Primary Substation Distribution Areas Data terms of use: Data freely available for download and re-use, with appropriate attribution. Data attribution: - Dataset created by Arup as part of the Outer East London sub-regional LAEP, 2025. - Contains public sector information licensed under the Open Government Licence v3.2 - Office for National Statistics (ONS), released 5th January 2022, ONS Website, methodology, Housing quality information for Census 2021 - UK Power Networks, 2025. Workflow Diagram: View PNG Comments: The data and analysis developed for the sub-regional LAEP was undertaken using data available at the time and will need to be refined for a full Phase 2 LAEP. Whilst every effort has been made to ensure the quality and accuracy of the data, the Greater London Authority is not responsible for any inaccuracies and/or mistakes in the information provided.

创建时间:
2026-01-11
二维码
社区交流群
二维码
科研交流群
商业服务