Benchmark data instances for the Multi-Objective Flexible Job shop Scheduling Problem with Worker flexibility
收藏NIAID Data Ecosystem2026-03-10 收录
下载链接:
https://data.mendeley.com/datasets/hpp82wtxfr
下载链接
链接失效反馈官方服务:
资源简介:
The proposed data consist of benchmark test instances for the Multi-Objective Flexible Job shop Scheduling Problem with Worker flexibility (MO-FJSPW). To the best of our knowlage, the MO-FJSPW is proposed for the first time by (Gong et al., 2017) [DOI:10.1080/00207543.2017.1388933], where the authors created data instances only for the total worker flexibility case: any machine can be operated by all the workers. That is why, we propose new benchmark data instances named “SFJW” and “MFJW” considering the MO-FJSPW with the partial worker flexibility case: each machine can be processed by a sub-set of workers.
创建时间:
2018-09-27



