five

Main transformer simulation data used in the calculation example

收藏
科学数据银行2023-03-13 更新2026-04-23 收录
下载链接:
https://www.scidb.cn/detail?dataSetId=ad2a385d86434025ac296ce75ca4db3a
下载链接
链接失效反馈
官方服务:
资源简介:
This paper fully considers the relevant parameters of the actual line of Shanghai Metro, and sets the train to operate in strict accordance with the established schedule. Based on the typical workday load data of the line in August, the power supply operation simulation model is established.Then simulation data is used for example verification. There are two 110kV main substations and four main transformers in the whole line. The capacity of 1# and 2# main transformers is 25MV·A, and the capacity of 3# and 4# main transformers is 20MV·A. There are 19 stations on the line, which are powered by 19 substations. Among them, 12 stations are hybrid substations that can supply power to the train, and the other 7 stations are step-down substations without traction.The first data set is the original main transformer data, and the second data set is the main transformer data after using the network storage collaborative optimization method proposed in this paper.The table structure is the same. The row label is time, and the unit is seconds. A day totals 86400 seconds, so there are 86400 rows of data. The column label shows the active power of four main transformers, in kW.
提供机构:
Wenbin Zhao; Qiuhan Gu; Shanghai University of Electric Power; 上海申通地铁集团有限公司 Shanghai Shentong Metro Group Co., Ltd
创建时间:
2023-03-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作