five

Economic and technical parameters.

收藏
Figshare2025-10-07 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/Economic_and_technical_parameters_/30299323
下载链接
链接失效反馈
官方服务:
资源简介:
Production scheduling models for open-pit mining complexes determine the optimal sequence for extracting mining blocks while adhering to technical and operational constraints. Although various mathematical models are available in the literature, solving them for large-scale operations remains computationally intensive. This challenge becomes more complex when models aim to simultaneously schedule block extraction and waste dumping, as this introduces additional variables and constraints, further complicating the problem. This paper presents a novel Simulated Annealing (SA)-based algorithm as a solution method for the simultaneous optimisation of block extraction and waste dumping sequences in open-pit mining complexes. The proposed approach incorporates an innovative variable reduction technique and a heuristic for generating reliable initial solutions. Numerical results show that the proposed algorithm achieves an NPV within 6.08% of the exact solution derived through a commercial solver while reducing the runtime by 82%. More importantly, for relatively larger instances that commercial solver fails to resolve, the proposed method maintains robust performance and delivers high-quality solutions within reasonable computational times.
创建时间:
2025-10-07
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作