Decreasing trends of ammonia emissions over Europe seen from remote sensing and inverse modelling
收藏资源简介:
The set consists of 5 files that constitute the main calculations of ammonia emissions over Europe for the years 2013-2020. <br> The detailed description of variables follows: 1) PriorEmission.nc<br> - Pall: tensor of the size 240 x 200 x 12 x 8 (lat x lon x months x years) with ammonia prior emissions used in the study [ng/m2/s] 2) PosteriorEmission.nc<br> - Xall: tensor of the size 240 x 200 x 12 x 8 (lat x lon x months x years) with ammonia posterior emissions [ng/m2/s] 3) UncertaintyEmission.nc<br> - Uall: tensor of the size 240 x 200 x 12 x 8 (lat x lon x months x years) with uncertainty of posterior emissions [ng/m2/s] 4) stations_vmodVSobs.mat <br> - st_list: list of stations identifiers, 53 stations in total<br> - st_coord: stations coordinates [lot,lat]<br> - st_OBSdays: matrix of the size 53 x (366*8) with observations in daily resolution [ug/m3]<br> - st_ind_obs: logical matrix of the size 53 x (366*8) with indicators when each station provides observation (1) and when not (0)<br> - st_prior_vmod_days: matrix of the size 53 x (366*8) with calculated concentrations using model with prior emission [ug/m3]- st_post_vmod_days: matrix of the size 53 x (366*8) with calculated concentrations using model with posterior emission [ug/m3]<br> - st_prior1_vmod_days: same as st_prior_vmod_days for EC6G4 prior<br> - st_prior2_vmod_days: same as st_prior_vmod_days for EGG prior<br> - st_prior3_vmod_days: same as st_prior_vmod_days for NE prior<br> - st_prior4_vmod_days: same as st_prior_vmod_days for VD prior



