Chemistry of freely-draining soil solutions at the Hubbard Brook Experimental Forest, Watershed 1, 1996 - present.
收藏DataONE2016-03-04 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/https://pasta.lternet.edu/package/metadata/eml/knb-lter-hbr/138/5
下载链接
链接失效反馈官方服务:
资源简介:
Tension-free lysimeters were installed in three soil horizons
at 13 locations within Hubbard Brook Experimental Forest
Watershed 1, representing the variation in elevation and forest
type of the watershed. At each location, the organic horizon and
the B horizon were selected for lysimeter placement. Soil
solution samples were collected approximately monthly and
analyzed for base cations, soluble anions, trace metals,
nitrogen and carbon.
创建时间:
2016-03-04



