five

Chemistry of freely-draining soil solutions at the Hubbard Brook Experimental Forest, Watershed 1, 1996 - present.

收藏
DataONE2016-03-04 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/https://pasta.lternet.edu/package/metadata/eml/knb-lter-hbr/138/5
下载链接
链接失效反馈
官方服务:
资源简介:
Tension-free lysimeters were installed in three soil horizons at 13 locations within Hubbard Brook Experimental Forest Watershed 1, representing the variation in elevation and forest type of the watershed. At each location, the organic horizon and the B horizon were selected for lysimeter placement. Soil solution samples were collected approximately monthly and analyzed for base cations, soluble anions, trace metals, nitrogen and carbon.
创建时间:
2016-03-04
二维码
社区交流群
二维码
科研交流群
商业服务