遇见数据集

KYAPED Hydro-Enforced Breaklines Phase 1 (2010 - 2017)

收藏
ArcGIS Hub2026-07-06 更新2026-08-20 收录
官方服务:

资源简介:

Hydro-enforcementenables hydrologic and hydraulic models to depict water flowing under these structures, rather than appearing in the computer model to be dammed by them because of road deck elevations higher than the water levels. Hydro-enforced TINs also utilize breaklines along shorelines and stream centerlines, for example, where these breaklines form the edges of TIN triangles along the alignment of drainage features. LiDAR was collected at a 1.0 pointpost spacing for the entire project area while no snow was on the ground and rivers were at or below normal levels. Download Link: https://ky.box.com/v/kymartian-kyaped-breaklines

水文强制建模(Hydro-enforcement)可使水文与水动力模型精准描绘水流在这类结构物下方的实际流动状态,避免因路面高程高于水位,导致计算机模型误将水流判定为受这些结构物拦挡。采用水文强制建模的不规则三角网(Triangulated Irregular Network,TIN)还会利用岸线与溪流中心线等特征线,例如当这些特征线沿排水设施走向构成不规则三角网的三角形边线时。本项目区域的激光雷达(LiDAR)数据以1.0点间距采集,采集时段地面无积雪、河流水位处于正常或低于正常水平。下载链接:https://ky.box.com/v/kymartian-kyaped-breaklines

提供机构:
KyGovMaps
创建时间:
2024-06-06
二维码
社区交流群
二维码
科研交流群
商业服务