Active Construction
收藏资源简介:
The City of Brampton projects & activities listed in the data are updated daily as the status of construction changes. Types of projects include but not limited too: Bridge Rehabilitation involves the modification, altercation or improvement of existing bridges on City of Brampton roads and pedestrian footbridges within Brampton’s parks. Intersection Improvements and modifications undertaken to improve the safety of the intersection. Major Road Construction includes the construction of new roads, widening or reconstruction of existing roads and grade separations by the City of Brampton or the Region of Peel. Park Walkway Improvements involves the removal of existing walkways and the placement of new and wider walkways within Brampton’s parks. Road Resurfacing involves the grinding out and repaving of the road surface to restore it to its original state. Sidewalk Construction includes the construction of new sidewalks as part of the 10-year capital program. Stormwater Management Ponds are developed in subdivisions to control rainwater entering natural areas such as creeks, lakes and wetlands. Once a subdivision is assumed, the City of Brampton is responsible for pond maintenance. Click here for more information. Street Lighting Upgrades involve the improvement and modernization of existing street lighting to provide safer and more efficient lighting for vehicles and pedestrians. Traffic Signal Upgrades and Installations include new installations and modernization of City-owned traffic signals and flashing 40km/h school zone signs. Traffic Calming projects help to reduce the speed and volume of traffic and improve the safety and quality of life in the neighbourhood.
本数据集收录的宾顿市(City of Brampton)项目与活动将随工程进度每日更新。项目类型包括但不限于:1. 桥梁修复(Bridge Rehabilitation):针对宾顿市市政道路上既有桥梁,以及宾顿市公园内人行天桥开展的改造、翻新或升级工程;2. 交叉口改善工程:为提升交叉口通行安全性而实施的优化与改造工作;3. 大型道路施工(Major Road Construction):涵盖宾顿市或皮尔区(Region of Peel)负责推进的新建道路、既有道路拓宽或改扩建,以及立体交叉工程;4. 公园步道改善(Park Walkway Improvements):移除宾顿市公园内既有步道,铺设全新加宽步道的工程;5. 道路重铺(Road Resurfacing):通过铣刨旧路面并重铺面层,恢复道路原有使用状态的养护作业;6. 人行道施工(Sidewalk Construction):作为该市十年资本计划组成部分的新建人行道工程;7. 雨水管理塘(Stormwater Management Ponds):在住宅开发小区内修建的雨水管控设施,用于截留雨水以避免其直接流入溪流、湖泊、湿地等自然区域。当住宅开发小区移交市政管理后,宾顿市将承担该类塘体的维护职责;8. 街道照明升级(Street Lighting Upgrades):对既有街道照明设施进行优化与现代化改造,为车辆与行人提供更安全、高效的照明环境;9. 交通信号升级与安装(Traffic Signal Upgrades and Installations):包含新建市政所属交通信号灯、对既有交通信号设施进行现代化改造,以及闪烁式40公里/小时学区限速标志的相关安装与升级工作;10. 交通宁静化工程(Traffic Calming projects):旨在降低区域内车辆行驶速度与交通流量,提升社区安全水平与生活品质的项目。点击此处查看更多详情。



