遇见数据集

Seismic Performance of Pile-Wharf Connections_Specimen 12:Full Scale/T-Headed/Unbonded/CottonDu/Gap

收藏
DataCite Commons2020-08-02 更新2025-04-16 收录
官方服务:

资源简介:

Specimen 12 was similar to Specimen 11:Full Scale/T-Headed/Unbonded, except a gap with foam was placed around the pile at the pile to deck interface. Specimen 12 consisted of a precast concrete pile connected to a reinforced concrete deck through partial embedment and longitudinal T-Headed connnection steel with a cotton duck pad.

创建时间:
2013-03-01
二维码
社区交流群
二维码
科研交流群
商业服务