Seismic Performance of Pile-Wharf Connections_Specimen 12:Full Scale/T-Headed/Unbonded/CottonDu/Gap
收藏数据链接:
官方服务:
资源简介:
Specimen 12 was similar to Specimen 11:Full Scale/T-Headed/Unbonded, except a gap with foam was placed around the pile at the pile to deck interface. Specimen 12 consisted of a precast concrete pile connected to a reinforced concrete deck through partial embedment and longitudinal T-Headed connnection steel with a cotton duck pad.
创建时间:
2013-03-01



