7 point timeseries (orthomosaics, DSM's, point clouds) of Casey biopile 8 during deconstruction phase
收藏资源简介:
A seven point time series showing the decommissioning of biopile 8 at Casey station, acquired between 31 December 2025 and 16 January 2026. The time series shows the various structural layers of the biopile, including sampling of the geosynthetic clay liner. Date: 31/12/2025; 06/01/2026; Pilots: Dr Rebecca McWattersPlatform: DJI M3E RTKSensor: DJI M3E (12.29mm) 5280 * 3956 cameraPositioning: M350 connected to D-RTK-2; precise D-RTK-2 antenna location not applied.Mode: Height above take-offAustralian Antarctic Division – Environmental Stewardship ProgramATEP Permit: Spedding – Project 4503 ReOC: Department of Climate Change, Environment, Energy and WaterType: VLOS Class 1 (less than 250m for M3E)Ground crew: Johan Mets, Tim Spedding, Mel Borup, Gavin Allen, Jordan Vink