Achieving precise through-crack between shaped charge blasting holes depends critically on the design parameters of the blasting operation. This study investigated the influence of borehole spacing an
Burg‘ulab-portlatish ishlarining samaradorligini oshirish zamonaviy tog‘-kon va qurilish sohalarida iqtisodiy va texnologik jihatdan muhim hisoblanadi. Mazkur maqolada portlatish jarayonlarini optima
Abstract The economics of a mining operation is directly influenced by blasting outcomes, where blasting aims to comminute the rock mass in order to attain smaller grain sizes to be loaded and hauled