Estimated tMRCA, days.
收藏Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Estimated_tMRCA_days_/472344
下载链接
链接失效反馈官方服务:
资源简介:
1Days post-seroconversion.2HPD is the highest posterior density interval, which represents the most compact interval on the selected parameter that contains 95% of the posterior probability. It is a Bayesian analog to a confidence interval.3ESS: Effective Sample Size – should be higher than 100, and characterizes the posterior distribution.
创建时间:
2015-12-02



