Table E-0-14: Preliminary cost estimates for monitoring and other mitigation activities during operational phase (Originally Table 11) Parameter/ActivityFrequency of activityPreliminary cost estimatePreliminary cost for 1 year activity periodRaw water: pH, Colour, Turbidity, Ammonia, Nitrate, Phosphate, SulphateDailyTk. 6,000/- per set of measurementTk. 21,90,000/-Raw water: Lead, Chromium, Mercury, Cadmium, Total Suspended Solids, COD, BOD5, Oil & greaseOnce a monthTk. 15,000/- per set of measurementTk. 1,80,000/-Treated water: pH, Colour, Turbidity, Ammonia, Nitrate, Residual Chlorine, TC, FCDailyTk. 5,500/- per set of measurementTk. 20,07,500/-Treated water: BOD5, COD, Aluminium, Total Dissolved SolidsOnce every two monthsTk. 8,500/- per set of measurementTk. 51,000/-Sludge from Clarifiers: TCLP test and determination of Al, Pb, Cr, Cd in TCLP extractOnce every three monthsTk. 14,000/- per set of measurementTk. 56,000/-Total annual cost for monitoring during operation phaseTk. 44,84,500/-

创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务