WEIGHTED SCHEDULING OF IDENTICAL PARALLEL LOOMS WITH SEQUENCE-DEPENDENT SETUP TIMES: A LARGE-SCALE INDUSTRIAL APPLICATION OF SIMULATED ANNEALING
收藏NIAID Data Ecosystem2026-05-10 收录
官方服务:
资源简介:
GAMS and MATLAB Data for Minimizing Makespan and Tardy Jobs in Parallel Machine Scheduling with Sequence-Dependent Setup Times Study
创建时间:
2026-02-26



